This release introduces new capabilities across Risk Framework Configuration, Entity Onboarding, and Data Validation, along with enhancements to CRR reporting. The key updates include configurable event-based and scheduled CRR recalculation, SFTP-based onboarding, and project-specific mandatory data fields. These enhancements provide greater flexibility in managing risk assessment, streamline entity onboarding, and improve visibility into CRR overrides.
Entity Hero now supports configurable Trigger Events and Trigger Times within the CRR Framework, allowing projects to control when risk calculations are triggered and updated. Previously, CRR recalculation was primarily driven by changes in entity data or incoming integration results. With this enhancement, users can configure individual framework nodes to recalculate either immediately when relevant data changes or at predefined scheduled intervals.
Trigger Event Configuration: Configure each Category, Condition, and Sub-condition to follow either an Update or Schedule trigger.
Schedule-based Recalculation: When configured as Schedule, incoming data changes are stored but do not immediately impact the CRR. The applicable node is recalculated only when its configured Trigger Time is reached, using the latest available data.
Flexible Scheduling: Configure recurrence frequency, intervals, and applicable repeat days or dates, along with schedule end conditions such as Never, After a specified number of runs, or On a selected date.
Configuration Inheritance: Trigger Event and Trigger Time configurations can be defined at Category, Condition, and Sub-condition levels. Child nodes automatically inherit the applicable configuration from their parent nodes.
Initial CRR Calculation: The complete applicable CRR Framework is evaluated when an entity is created, including nodes configured for scheduled recalculation.
Entity Outcome & Audit History: Recalculation activities, including scheduled and update-driven calculations, are recorded to maintain visibility into CRR changes and their calculation history.
Framework Excel Support: Trigger Event and applicable scheduling configurations are supported through framework Excel uploads, along with the required validations.
Entity Hero now supports project-specific mandatory data field configurations, allowing clients to define additional mandatory fields based on their requirements.
Individual and Organization: Configure additional mandatory fields separately for both entity types.
Existing mandatory fields: The default mandatory fields continue to apply across all projects.
Consistent validation: Mandatory field validations are enforced across UI, Batch, and API entity creation.
Data completeness: Entity creation is restricted when applicable mandatory fields are not populated.
A new CRR Override Report is available in the Reports module, providing visibility into entities whose Customer Risk Rating (CRR) has been manually overridden.
Date-based reporting: Generate reports for a selected date range.
CRR comparison: View Mathematical CRR and Risk Level alongside the overridden Logical CRR and Risk Level.
Override information: Access the justification, attachment availability, and details of the user who performed the override.
Timestamp details: View the date and time of each override.
Email delivery: Receive the generated report on the registered email ID.
Report tracking: Track report-generation requests and their status through Report History.